Behind the scenes at SIAMS #6
Let's continue exploring the assembly of the SIAMS microtechnology plant...things are speeding up again!
Everything is ready for the arrival of the heavy machines next Monday and Tuesday (over 60 heavy machines and later over 50 machines weighing less than 1.5 tons).
By the way: over 100 open positions already advertised
There's a lot of talk about the lack of manpower in the technical and industrial professions. At SIAMS, all exhibitors who are looking for staff were invited to make this known. According to the latest projections, a list of over 100 to 120 open positions will be made available to visitors looking for a job!
Some of the stands are already almost ready, and are veritable gems.
The 30 kilometers of power cables are mostly invisible ;o)
Not a very discreet SIAMS hoodie ;o).
Lifting equipment capable of transporting machines weighing up to 12 tonnes!
The freezing temperature and drafts are missing from the photo ;o(.
The system of stretched canvases allows for exceptional rendering with simplicity.
SIAMS? At the heart of the Jura Arc (Switzerland) of microtechnology.